The feature to add comments on a time entry are very helpful, it would be great if these showed up in the task history.
-
Hi.
we need the same feature. currently when I opened time tab for the work item, I only see total time per user . It will be nice to see a grid with all entered times and comments for this workitem(date logged and so on..) or as an option copy the comment into work item history
we plan to use comment tab to provide additional info of what was done for the task, but this is not possible if you can't see comment from the work item screen
we are using VSTS online version
Please sign in to leave a comment.
Comments
2 comments