Feature Request to match Activity Type to Work Item Activity Type
Gathering FeedbackMy system default Activity Type is Development. If I add time to a work item with activity type = Development then I can simply add the time.
If I add time to a work item with activity = Documentation I have to change the activity type for time to Documentation. It would be easier to default to the activity of the work item.
-
We have connected requests, and I think it is a good idea to merge them within one thread.
1) https://support.7pace.com/hc/en-us/community/posts/115017826103-Activity-types-and-TFS-activity
From Mathieu Schmitt:
In the rule menu (see screenshot), 7pace fields are not available. I would like there to be a way to have these 7pace fields available in picklist, to be able to set-up rules when time spent is filled in a 7pace field.
By default ADO Boards, there is a default "Activity" field available. This field is used to :
- Manage sprint capacity set-up.
- Follow the capacity chart to see if your sprint is on track or not.
If we want to use this 2 ADO features above(capacity set-up, capacity chart), we must use the default ADO activity field, rather than the 7Pace "activity type".
So I wanted create a rule to link the default ADO "Activity" field and the 7Pace "Activity type", to be sure to have the activity data only in one field rater than in 2 fields.
---
We've created an item (32966) in our backlog so we could revise it after the release of Rules. and let's keep this thread for the discussion.
-
Hi Jason,
thanks for reaching out! This request does come up every now and then, so we are definitely aware of the need for this feature. Unfortunately, I have to admit that currently it is still not in our plans for the near future. I am sorry that I don't have better news for you, but we will keep this thread updated if this changes.
All the best, Nici
-
I'm not sure how the two links shared by Maxim relate to this particular request.
Rather use https://support.7pace.com/hc/en-us/community/posts/115019267123-Request-for-Activity-Types-to-match-default-TFS-Task-and-be-required to vote for a feature to match Timetracker's work log Activity Type to ADO Activity field value if matched.
Please sign in to leave a comment.
Comments
6 comments